Upcoming Construction on U.S. 30 Bypass: NW Bridge Ave

Please be aware that NW Bridge Ave (the left turn westbound off the St John’s Bridge) will be closed from January – July 2024 according to ODOT’s site:

Heavy traffic and delays are expected from January to July 2024 on U.S. 30 and N Lombard Street (U.S. 30 Bypass). Construction activities will require full, around-the-clock closures of the southern section of NW Bridge Ave. (U.S. 30 Bypass). Local traffic will be detoured on the northern section of NW Bridge Ave. A detour map is shared below. 

From ODOT official website
Source: ODOT.gov

en_USEnglish